ExcavationForeign missions
Khirokitia: the French Mission under Le Brun
1976–2009 · Khirokitia
Also known as Mission francaise de Khirokitia; Mission franco-anglaise (1976)
The French mission at Khirokitia, 1976 to 2009: its trenches showed Dikaios's 'Main Road' to be an enclosure wall and the east sector of the Aceramic Neolithic village to be older than the west.
Map of Cyprus
Where the work took place
- Main site
- Also worked at
- Ground above 200, 500, 1,000 m
Sites
- 1Khirokitia
- 2Khirokitia-Vouni
The project
At Khirokitia, the long stone structure that Dikaios had read as a road turned out, in the trenches of the French mission under Alain Le Brun, to be a perimeter wall, and the east of the village proved to be older than the west1. In Le Brun's account this made Khirokitia a walled village1. The mission worked there from 1976 to 20092,3.
The 1976 campaign
After the Turkish invasion of 1974 the Cypriot authorities decided to reopen Khirokitia as part of a new research programme1. The campaign of August and September 1976, a joint one with the British School of Archaeology in Jerusalem, was directed by N. Stanley Price and Le Brun, and set out to establish the extent of the settlement and to re-study the structure Dikaios had called a road2. It resumed the work of the earlier Dikaios campaign of 1936 to 19464.
The team collected surface finds systematically over the whole hill and ran a soil-resistivity survey, with A. Hesse and S. Renimel of the C.N.R.S. geophysical centre at Garchy, then checked the results with test trenches 1 m deep2. Four control soundings (Tr. 7 to 10) west of Dikaios's area found no occupation, showing that the settlement did not extend far in that direction2. In the east, a section known as Tr. 6 had been cut by a road in 1971, about 150 m from Dikaios's area near the Maroni. It was cleaned and recorded: 12 layers with three main habitation levels, including a brick-built oval structure, S. 76, preserved to about 1.20 m2. Five trenches across the 'road', structure 100, showed several phases of construction and rebuilding2.
The west sector, 1977 to 1981
From 1977 the work was run by the Centre National de la Recherche Scientifique as a French mission under Le Brun, with the aim of fixing the limits of the settlement and gathering information on building techniques and the spatial organisation of the village5. The annual reports name Le Brun as the sole director; Astruc describes Odile Daune-Le Brun as co-director as well5,6. The French Ministry of Foreign Affairs is recorded as funder in 19807.
In 1977 the team opened 180 m2 northwest of Dikaios's zone V and west of the 'Main Road'. It found three building levels of the Aceramic Neolithic, seven circular dwellings and two pit burials, an adult and a child5. The 1978 season added 75 m2 and six circular units. A wall about 1 m thick (245/263), some 6 m west of structure 100, marked the western limit, and the finds included bone tools, andesite bowl fragments, a mother-of-pearl pendant and an arrowhead8. By 1980 the excavated area had doubled. Level III had six dwelling units, five of them around a plastered space with a grain-grinding installation (loc. 289)7.
In 1981 the excavators showed that, in the area dug, every construction west of wall 100 is later than it. Wall 284, about 3 m high and traced for over 15 m, closed the built area at Level III, and a red-ochre wall painting was found at Khirokitia for the first time; its motif could not be made out9. S. Davis, M.-C. Cauvin and D. Stordeur reported on the fauna, the chipped stone and the worked bone9.
The dead lay in pit graves under house floors, with little or no grave goods. A stone, a quern or, in burial 538, a deer scapula was set over the skull in several cases9,10. Burial 290, dug in 1980, was an adult in a contracted position with a quern with hammered projections laid over the skull and upper torso7. Twenty burials were found in 19819.
The older east sector, 1983 to 1986
In 1983 the mission worked on both sides of structure 100. The east sector, whose deposits lay under wall 100, was occupied before the west. Wall 284 was now traced for over 60 m, and the fallen roof of S.85 showed impressions of branches under pisé, read as evidence for a flat terrace roof11. Le Brun, in the 1983 report, took the occupation to have lasted much longer than Dikaios had supposed, and thought the move west better read as a displacement than as an expansion driven by population growth, if the absence of a contemporary level in the east is confirmed11.
In 1984 only the east sector was dug. Structure 100 proved to be the last of at least three successive boundary walls, and the houses there were circular, with internal diameters over 4 m, one of 4.80 m. House S. 117 had two pillars and a U-shaped notch. Three anthropomorphic pieces made of andesite pebbles lay outside houses12. The 1986 season extended the east sector south and east, joining areas dug by Dikaios. A sounding beside S. 116 reached virgin soil through at least six architectural levels, and pollen and charred remains were sampled10. Twelve burials were excavated and five more located10.
The hilltop, the foot of the hill and the north side
In 1997 the work turned to the summit, south of the village entrance. Part of the enclosure wall had collapsed at the end of Level III, and the entrance was rebuilt as a mound with ramps. A new area at the foot of the hill produced well-built structures and limestone bowls13. The 1998 season refined the stratigraphy there, and in 2000 the later part of the east-sector sequence was defined and the house S148 was excavated in the west sector13.
In 2008 and 2009 Le Brun worked on the terraces of the north side to trace the two successive boundary walls. The earliest, found in a deep trench near the river, is a massive pisé wall faced with stone that runs parallel to the Maroni3,14. The Department of Antiquities report for 2008 says this research resulted in a profound revision of the settlement's history, reading the later southern expansion as a rearrangement of built space and not as population growth14.
Papaconstantinou noted in 1997 that the mission's stratigraphy was exceptionally well presented but its finds not yet published15. In the 1990s the Department of Antiquities had a visitors' centre at the site, with replicas of part of the enclosure wall, an entrance and round houses1,16.
Directors and team
Directed by
- Alain Le Brun1976–2009
- N. P. Stanley Price1976
Team
- A. Hesse1976
- S. Renimel1976
- Odile Daune-Le Brun1977
- S. Davis1981
- M.-C. Cauvin1981
- D. Stordeur1981
Institutions
Seasons
11 seasons- 1976August-September 1976
Preliminary campaign: surface collection, geophysical survey (A. Hesse, S. Renimel, CNRS Garchy) and trenches 7–10 west of Dikaios's area showed the settlement does not extend west; clearing of the section Tr. 6 near the Maroni river, 150 m east, showed 12 layers with three habitation levels (S. 70–81), implying eastward extension; five trenches across Dikaios's 'road' (structure 100) suggest a composite structure, possibly a defensive wall.
Directed by N. P. Stanley Price, A. Le Brun[1]
- 19771977
180 m2 opened NW of Dikaios's zone V and west of the 'Main Road': three Aceramic building levels, seven circular houses of stone, pise and mud brick, two pit burials (adult and child, the child with a sacrificed bovid?); limit of settlement fixed.
Directed by A. Le Brun[10]
- 1978
Continuation of the 1977 sector plus 75 sq m; thick (c. 1 m) wall west of Dikaios' 'Main Road' marks the western limit and suggests a fortified village; six new circular units; two burials inside houses, one under a millstone; bone tools, andesite bowls, a pearl pendant, an arrowhead.
Directed by A. Le Brun[17]
- 1980
Excavated area doubled; Levels III, II and I studied: grinding installation (loc. 289), wall closing the built area at Level II, ten habitation units, domestic space changes, four burials under house floors (burial 290 with deliberately placed quern), bone tools and incised pebbles.
Directed by Alain Le Brun[16]
- 1981
Showed all constructions west of wall 100 are later than it; levels III-I traced; wall 284 3 m high; first red-ochre wall painting at Khirokitia; twenty burials under house floors; lithics and bone industry show no Levantine affinity.
Directed by A. Le Brun[19]
- 1983July-August 1983
East sector shows the earliest village was bounded by wall 435/423 older than structure 100 (Dikaios' 'main road'); occupation therefore longer and east precedes west. West sector: wall 284 now traced over 60 m; fallen roof of structure S.85 suggests a flat brushwood-and-pisé roof.
Directed by A. Le Brun[21]
- 1984July-August 1984
East sector only, pre-ceramic Neolithic: earlier enclosure walls beneath wall 100, circular houses over 4 m across, house S. 117 with two pillars and a U-notched platform, seven burials, abundant bone tools and three andesite anthropomorphic figurines.
Directed by A. Le Brun[22]
- 1986July-September 1986
Fieldwork east of Dikaios's Main Road: deep sounding to virgin soil showing at least six architectural levels, rich carbonised remains and pollen samples; seven new dwellings, completion of S.118 and S.117 floors; twelve burials excavated, stone or deer scapula placed on skulls.
Directed by A. Le Brun[23]
- 1997
1997: summit and entrance, collapse of enclosure wall end of level III, conical earthen entrance mound, rubbish dump; new area at the foot of the hill with well-built structures and limestone bowls; 2000: E sector phases, large house S148 with celadonite paint.
Directed by A. Le Brun[24]
- 2008
Listed among the foreign missions of 2008 as working at the Neolithic site. Work on the north-side terraces to trace the two successive enclosure walls; north side more widely inhabited than thought; later south-side expansion read as rearrangement rather than population growth.
Directed by A. Le Brun[2]
- 2009July-August 2009
North side research completed; the earliest enclosing wall found in a deep trench follows the Maroni river course, of pise with stone facing, redefining the settlement as a walled village and its history as a rearrangement of built space.
Directed by Alain Le Brun[3]
What was found
Periods
Features and finds
structure 100; structure 105; tholos XX; tholos XLIX; Tr. 6 section; Main Road (structure 100); burials 203, 207; Main Road (100); wall 245/263; units S. 84, 85, 88, 89, 91, 92, 94; loc. 289; structure 100 (Main Road); burial 290; S. 84; wall 100; wall 284; wall 245; wall painting; wall 435; wall 423; S.85; structure 117; S. 116 sounding; S. 117; S. 118; locus 535; burial 558; burial 538; terraces; enclosure walls; enclosure wall; stepped entrance.
Publications
12 itemsAnnual reports of the Department of Antiquities
Chronique des fouilles (Bulletin de correspondance hellénique)
- Chronique des fouilles et découvertes archéologiques à Chypre en 1976
- Chronique des fouilles et découvertes archéologiques à Chypre en 1977
- Chronique des fouilles et découvertes archéologiques à Chypre en 1978
- Chronique des fouilles et découvertes archéologiques à Chypre en 1980
- Chronique des fouilles et découvertes archéologiques à Chypre en 1981
- Chronique des fouilles et découvertes archéologiques à Chypre en 1983
- Chronique des fouilles et découvertes archéologiques à Chypre en 1984
- Chronique des fouilles et découvertes archéologiques à Chypre en 1986
Related
References
- 1.A. Le Brun, 1997, Khirokitia: A Neolithic Site.
- 2.V. Karageorghis, 1977, Chronique des fouilles et découvertes archéologiques à Chypre en 1976, Bulletin de correspondance hellénique 101.
- 3.Department of Antiquities, Cyprus, 2010, Annual Report of the Department of Antiquities for the year 2009.
- 4.Stuart Swiny, 2001, The Earliest Prehistory of Cyprus: From Colonization to Exploitation.
- 5.V. Karageorghis, 1978, Chronique des fouilles et découvertes archéologiques à Chypre en 1977, Bulletin de correspondance hellénique 102.
- 6.Laurence Astruc, 2001, Le village néolithique de Khirokitia (Néolithique précéramique récent) : de l'ouverture à la fermeture, Cahiers du Centre d'Études Chypriotes 31.
- 7.V. Karageorghis, 1981, Chronique des fouilles et découvertes archéologiques à Chypre en 1980, Bulletin de correspondance hellénique 105.
- 8.V. Karageorghis, 1979, Chronique des fouilles et découvertes archéologiques à Chypre en 1978, Bulletin de correspondance hellénique 103.
- 9.V. Karageorghis, 1982, Chronique des fouilles et découvertes archéologiques à Chypre en 1981, Bulletin de correspondance hellénique 106.
- 10.V. Karageorghis, 1987, Chronique des fouilles et découvertes archéologiques à Chypre en 1986, Bulletin de correspondance hellénique 111.
- 11.V. Karageorghis, 1984, Chronique des fouilles et découvertes archéologiques à Chypre en 1983, Bulletin de correspondance hellénique 108.
- 12.V. Karageorghis, 1985, Chronique des fouilles et découvertes archéologiques à Chypre en 1984, Bulletin de correspondance hellénique 109.
- 13.Louise Steel, 2003, Archaeology in Cyprus 1997–2002, Archaeological Reports 50.
- 14.Pavlos Flourentzos, 2010, Annual Report of the Department of Antiquities for the year 2008.
- 15.D. Papaconstantinou, 1997, Identifying Domestic Space in Neolithic Eastern Mediterranean: Method and Theory in Spatial Studies, PhD thesis, University of Edinburgh.
- 16.Louise Steel, 1997–1998, Archaeology in Cyprus 1987–1997, Archaeological Reports 44.
Sources
- 1.Chronique des fouilles et découvertes archéologiques à Chypre en 1976, p. 733; pp. 28–31; pp. 28–29.
- 2.Annual Report of the Department of Antiquities for the year 2008, p. 51; p. 12.
- 3.Annual Report of the Department of Antiquities for the year 2009, p. 59; p. 58.
- 4.Chronique des fouilles et découvertes archéologiques à Chypre en 1972, p. 635.
- 5.Archaeological News from Cyprus, 1976.
- 6.Fabrication et utilisation de l'outillage en matières osseuses du Néolithique de Chypre: Khirokitia et Cap Andreas-Kastros, p. 14.
- 7.Chronique d'archéologie chypriote, p. 48.
- 8.Khirokitia: A Neolithic Site.
- 9.La France et l'archéologie chypriote. Introduction, p. 135.
- 10.Chronique des fouilles et découvertes archéologiques à Chypre en 1977, pp. 27–28.
- 11.Economic Zooarchaeology: Studies in Hunting, Herding and Early Agriculture.
- 12.The Neolithic and Chalcolithic Figurines of Cyprus, p. 39; p. 99.
- 13.Identifying Domestic Space in Neolithic Eastern Mediterranean: Method and Theory in Spatial Studies, p. 53.
- 14.Identifying Domestic Space in the Neolithic Eastern Mediterranean, p. 53.
- 15.Le village néolithique de Khirokitia (Néolithique précéramique récent) : de l'ouverture à la fermeture, p. 9.
- 16.Chronique des fouilles et découvertes archéologiques à Chypre en 1980, p. 980; pp. 15–17.
- 17.Chronique des fouilles et découvertes archéologiques à Chypre en 1978, pp. 17–20.
- 18.Challenges for funerary taphonomy viewed through prehistoric Cyprus, p. 4.
- 19.Chronique des fouilles et découvertes archéologiques à Chypre en 1981, pp. 30–32; p. 32.
- 20.Archaeology in Cyprus, 1981–85, p. 68.
- 21.Chronique des fouilles et découvertes archéologiques à Chypre en 1983, pp. 37–43; p. 928.
- 22.Chronique des fouilles et découvertes archéologiques à Chypre en 1984, pp. 28–29.
- 23.Chronique des fouilles et découvertes archéologiques à Chypre en 1986, pp. 11–13; p. 13.
- 24.Archaeology in Cyprus 1997–2002, p. 14; p. 105.
- 25.Archaeology in Cyprus 1987–1997, p. 8; p. 143.
- 26.Archaeological News from Cyprus, 1977–1978, p. 63.
- 27.The Oxford Encyclopedia of Archaeology in the Near East, p. 90.
- 28.Review of M. Melas, Potidaion Karpathou (New York: Poseidon Benevolent Society of Karpathos, 1991) and J. Yon (ed.), Kinyras (1993), p. 230.
- 29.Cyprus: From the Stone Age to the Romans, p. 18.
- 30.Compte rendu et réflexions sur le colloque international "Cypriote Stone Sculpture" tenu à Liège et Bruxelles du 17 au 19 mai 1993, p. 42.
- 31.Archaeology in Cyprus, 1976–80, p. 50.
- 32.Neolithic Revolution: New Perspectives on Southwest Asia in Light of Recent Discoveries on Cyprus, p. 165.
- 33.The Earliest Prehistory of Cyprus: From Colonization to Exploitation, p. xii.