Page 39Scan 37 of 147
Continued from p. 38
… the rock floor mentioned, which within the walls has been exposed over the whole area at roughly the same level, the earth above it is removed in those places where practical reasons allow it.
25/10. The middle of the trial trenches described the previous day cross-trenches over the stage are extended further The rock with the mentioned floor comes here into view at only a couple of dm. depth. The floor is followed, swept and established in direction toward the orchestra The direction chang of the trench is changed toward the first trial section in the theatre. The level difference between the orchestra floor in the trial section and the stage's floor in the most recently opened trench is estimated at c. 1,80 m. Under such circumstances it is remarkable that the stage floor extends so far toward the orchestra. Some metres from the terrace-wall gypsum traces are found at the same time as the level sinks inward. The exposure of the stage floor is continued. - The earth cutting on the west wing continues and is further placed farther out on the spot where one can expect to find the in entrance to the orchestra. Here a gutter is established … continues
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain
