Getty Conservation Institute's Neville Agnew developed the hexashelter erected in November 1989 over the Orpheus and Hercules and Amazon mosaics at Nea Paphos.
Biography
In November 1989 a lightweight shelter went up over two mosaics at Nea Paphos, built "under the direction of Neville Agnew and Richard Coffman" of the Getty Conservation Institute1. It was the hexashelter, which the volume's acknowledgments say Agnew developed and which was made in kit form by Jim Davies at the Institute's workshop1. It replaced the temporary shelter the Department of Antiquities had built over the reinstalled Orpheus mosaic, which was removed for good1.
Agnew and Richard Coffman describe it as a prototype: an aluminium tube frame with a fabric roof and side panels, in two hexagonal rings over the Orpheus and the Hercules and Amazon mosaics1. They erected it with a five-man Department crew in about three weeks, and impermeable roof membranes were added in 19901.
With Po-Ming Lin he wrote the chapter on monitoring temperature and humidity in several Paphos shelters, begun in September 1988. Annual visits were too few to keep the instruments calibrated, so Department staff took spot readings between August 1989 and May 1990. The authors concluded that shelters with side panels protect adequately even when open1. Both chapters appeared in the Institute's 1991 volume on the conservation of the Orpheus mosaic, which also credits him with photographs1.
Life and work
- September 1988Four portable temperature/relative-humidity recorders (Shinyei THR-2) installed in several of the Paphos mosaic shelters and at the Orpheus mosaic as part of the monitoring Agnew and Lin report; further annual site visits in November 1988, 1989 and 1990.
PaphosPrice 1991, pp. 42-43
- November 1989Built the hexashelter, a lightweight modular aluminium-and-fabric prototype shelter, over the Orpheus and the Hercules and Amazon mosaics, with a five-man crew from the Department of Antiquities; about three weeks' work; Agnew and Coffman are named as the authors who erected it.
- 1989The hexashelter was developed by Agnew and constructed in kit form by Jim Davies at the GCI's workshop.
Marina del ReyPrice 1991, p. x
- 1990New impermeable roof membranes installed on the hexashelter (two weeks' work).
PaphosPrice 1991, p. 37
- 1991Published with R. Coffman 'Development and Evaluation of the Hexashelter' and with Po-Ming Lin 'Environmental Monitoring of the Paphos Mosaics' in the GCI volume on the Orpheus mosaic.
Connections
5 peopleScholarship
- Wrote with N. P. Stanley Price1991
- Wrote with Po-Ming Lin1991
Colleagues & contacts
- Worked with Demetrios Michaelidespossibly1989–1990
- Connected with N. P. Stanley Price1989–1991
- Worked with Richard Coffman1989–1991
- Worked with Jim Davies
Sources
- 1.Nicholas Stanley Price (ed.) (1991). The Conservation of the Orpheus Mosaic at Paphos, Cyprus. Getty Conservation Institute.
- 2.N. Agnew, R. Coffman (1991). “Development and Evaluation of the Hexashelter”. The Conservation of the Orpheus Mosaic at Paphos, Cyprus, 36-41. The Getty Conservation Institute.