Unnumbered pageScan 14 of 105
16
Drawing: plan labeled TRENCH 3 / Plan. Grid coordinates: A, B, Γ, Δ, E, Z, H, Θ; horizontal coordinates 2, 4, W 2, West; labels inside Trench: "STREET I", "door jamb", "ROCK CUT CONDUIT", "Rock", "UNDUG", "ROCK CUT CONDUIT 0", "Rock", "Rock"
Right page
| Diary (cont fr. p. 15) | 17 |
Nov 13 (cont fr p. 15) H - Θ 3rd stratum began fourth stratum west of wall (see plan p. [blank]) Found jamb post of conduit, probably for realization [symbol: triangle] level as was found p 15. 2nd stratum (see plan p. 10) found under 2nd stratum Tr 4 (see plan) Began trench 4 A-Γ dug Tr 2, 2nd stratum A-E west 4-6 A-E west 2-4. Dug first stratum to rock bottom of Tr 4 west 6-8 & Tr 4 west 6-8 Tr 2 first stratum Δ-E west 20-22 & E-Z west 20-22, also A/Tr 2 A-B west 18-20
Nov 14 Tr 3 began E-Z west 0-2. Tr 2 Tr 1 west 4-6 first stratum to rock also 2nd stratum in deepest part of trench probably goes down = soft white soil, without shards of any finds Finished removing surface soil Tr 2 A-E west 18-20. Dug same 10-14 Tr 2 Δ-E west 2-4 4th & 5th strata. Finished removing surface soil Tr 4 A-Γ started Tr 4 A-E surface soil also Tr 4 δ-E to south of
Nov 15 Tr 4 δ-ε south 0-14, first stratum surface soil Tr 3 H-Θ east 14- 0 to conduit of soft trench dug around to find whether foundation wall or pipe trench & found conduit continued & leading off east toward [symbol: circle] this relation to Nov 9 p. 15) A-Δ & A-Γ also dug out trench south of A-E dug Tr 2 A-B was dug foreground - south of Tr 2 surface soil Tr 4 δ-E North 0- Γ-E Cont p. 23
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain
