Page 116Scan 12 of 40
Levels
| Absolute | ||
| Central post | 1.33 | |
| A2 from center | ||
| B1 " " | 1.06 +0.27 | |
| B2 " " | 1.16 +0.17 | 7.63 |
| B3 " " | 1.70 -0.37 | 8.15 |
| B4 " " | 2.18 -0.85 | 8.63 |
| A3 | 2.69 -1.36 | 9.14 |
| A4 | 4.22 -1.89 | 9.67 |
| bottom of lot | 4.36 -2.03 | 9.81 |
| 130 A1 to center | 5 -3.54 | 4.84 7.78 |
| " " A2 | 5 -1.85 | 4.83 6.09 |
| " " B1 | -3.22 | 4.52 |
| EnEnd of lot above A1 | 3.62 3.34 | |
| A1 from Georko's αλονι | 4.52 4.24 | |
| Center of Georko's threshing floor | 0 | |
| 28 Top |
Slope ca 16°
Right page
3-3-37TRENCH 2 cont'd from p. 113 white clay at the 0.60 floor level Finish cleaning the mass of stones in Tr. 2 West, outside of unit #2. No wall line is evident. The highest of these stones are 0.20 below the surface.
Photo Bam. 7 of central part of trench, cleared to 0.60 level in unit 1
Leave trench 2 as it is until some more areas have been investigated and we decide whether or not to clean trenches 2+3 as a single area.
13-3-37 Recommence work in trench 2, by extending the east extension north and south. We isolate two surface intrusions which were missed when the trench was first dug. They do not go far.
(to p. 139)
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain