16 16 Wednesday 29 September 1999
continuing the clearing of the ramps. (UF 9, 10 and 11)
General clearing of the floor of level 2 to the west and south of the ramp 731. 3 slabs of marmaro to the west. beaten earth floor elsewhere. Sol = Loc 828
Thursday 30 September 1999
continuing the excavation of the ramps = UF 9, 10 and 11 + excavation to the the to the north of the 3 marmaro set [illegible] on floor 828, at the west of ramp 731 Aim: to find the floor of level 2. Problem: the area was disturbed by a few blows of a mechanical digger -> in fact the floor was not found. the excavated fill UF 12 made up of fragments of mudbrick and rubble
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain