Page 15Scan 16 of 70
-> ramp 494 - continuation of the excavation of UF 5 . the lower floor is finally reached along the back wall of the building - = Sol Loc 827
End of day, arrival of the mechanical digger which extends the excavation area towards the north -
Tuesday 28 September 1999
cleaning of the surface after the passage of the mechanical digger = UF 8
resumption of the clearing of the ramps in three sectors -
on ramp 494 -> fill = UF 9 on ramp 731 -> " = UF 11 between the 2 ramps -> — = UF 10
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain