Page 12Scan 13 of 70
12
-> rampe 731 clearing of the fill layer UF 6 in the service corridor. At the base of the fill, numerous rubble probably rest on the floor lower, from the end of state 2.
Friday 24 September 1999
Ramp 731 -> continuation of the excavation of the fill UF 6.
Ramp 494. upper part, in the service corridor, excavation of UF 5 consisting of a succession of building materials abandoned; at the top mud bricks, at the bottom rubble + green fill. The north/east end of the ramp of state 2 (in mud brick) has been cleared.
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain
