Page 48Scan 77 of 118
Friday 20 September 19635th day of work
Before 6 h 30 -
Pegging out of the new trench sector W. Paving - This trench is laid out to align with the large trench adjoining. The work of readjusting this sector had begun in 1962.
Morning - Topographic triangulation -
Photography = Sections in the sanctuary area - Hearth pt. 996 Sector 206 WT.
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain
