Page 66Scan 133 of 188
Friday 7 December 1962
The afternoon is devoted to protective measures for the Hall: a layer of sand recovered with a mattress of earth, in order to preserve, if possible in its present state, the floor III until the 1963 campaign. Meanwhile, I am drawing the stratigraphic section of the south side of the rectangular "Pit", cutting through the lower layers, below the 3 floors of the Proto-Geometric Hall.
At 16h, closing of the excavations with the male labour force, pay of the workmen who worked in the Tr. East, on the clearing of the "hall with the bull's heads". Only those who will work again the next day, Mikael and the two specialists Manoli.
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain
