Page 55Scan 111 of 186
Tuesday 30 Sept.19 men 22 women removal of the earth accumulated yesterday. (tractor) very strong wind N, NE, E obliges us to spread out and redistribute the area. no wall intact, the clandestine excavations have removed a part of each of them, and the front wall W on the N-S street is non-existent down to the rock. a TC figurine, S part of the machine trench photos and sketches. skeleton crew of the PWD begins the construction of the ring road W, outside the rampart threats of a general strike are taking shape, a control military on the road blocks the bridge for long hours.
Drawing: arched bridge with crenellated parapet, a line of cars and trucks with soldiers on top, and a coil of barbed wire at the right end
Wednesday 1st October unusual silence at the area, the workmen arrive at the last minute and ask to consider what course of action to take 6h15 they opt for the strike and go home no traffic on the road
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain
