Page 28Scan 39 of 126
Wednesday 14 Sept.49._ - 4th 5th day of excavation
T. 536h.30. Fine weather - [illegible] Numbering of the tombs Proposal from the Enkomi contractor for removal of earth from trench L (£ 50). New engagement of a Special. from Famagusta at the price of 8/6 per day. trench L excavation of tombs and wells trench K excavation over 60 m_ T.2. on floor of tomb 2 Vessels with pointed base + small bowl + 2 repoussé gold plaques at 2m90. below present ground + 1 signet ring (gold) at 0m70 upper part of the chamber (no sherd at this level) above. selection of sherds (in bag) Taking of photos - and drawing - sieving of the earlier earth. clearing of a bronze or silver plate at the same level containing another in bronze - 14h30 stop of the excavation in the chamber and clearing of the upper part because of danger of collapse - 19h45 Arrival of Mr Dikaios. the plates of gold and the ring are entrusted to him. for deposit in the Museum -
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain
