Page 95Scan 5 of 10
corrugated galvanized iron sheets to make on the whole new construction a double roof, likewise on the old house over the part uncovered and badly re-covered by the contractor. This contractor, in my opinion, does not deserve the confidence. It is also clear that the architect of Nicosia responsible for receiving the construction did not make, or only superficially, his inspection before having me pay the price of the construction to the contractor. – These expenses additional have obliged me to carry over to my next budget the enlargements that I extensions planned for the camp to house storerooms for pottery and a workshop. – The floods having also waterlogged, and rendered inaccessible the floors and constructions cleared in the interior of the town, I have not been able to finish the work at the end of the campaign and p.c. shall we need to clean out all that before being able to draw the information from the stratigr. sections uncovered during this campaign. – In short, I have really nothing special to say to the newspapers, moreover about this campaign; it is preferable that we await the 1967 campaign to resume-
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain
