Page 35Scan 71 of 74
and well, floor very thick, very hard, kept as a baulk, [illegible] overlying ae second floor from which it is separated, at this point, only by a very thin grey dividing line (in section) This lower floor must be the same as the one already cleared at 103 E under the ash layer visible on the intermediate bench at 102-103 E _ The very thick very hard floor near the well, at the upper level, must correspond to a repair of the lower floor and must stop (towards the S) at the level of the door (1 upright standing near the well, 1 crapaudine stone between this stone and the NS wall)
In 2W 102 - photograph of the granular mortar slabs
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain
