Page 68Scan 139 of 208
Saturday 25 November 1967Last morning of excavations with the team of pickmen: measures of protection against rain, by a fill, more substantial, of spoil, kept all along the east trench on the upslope of the central excavated part, of the town. Arrangements are made to finish, everywhere, on a well stripped floor, which is done at the hour of closing of the area, at 11 h, followed by pay. 9 workwomen are kept on for the last days, and the final work on the area ( washing of sherds, cleaning of walls, and study of the maison of the well with the swords ( where an interesting terracotta tub with internal partitioning has been found in the earliest level, on the rock (cf. notes J. Lagarce).
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain
