Page 37Scan 75 of 122
Monday (for this week see plan p. 36) 31.10.66
A new trench is opened with squares 205, 206 and 207 (for the continuation see the notes of Mr Nicolardot)
In square 206 a pit which will be, as usual, emptied separately. In square 207 two pits, which are also emptied.
The former trench 105 to 107 is stopped except for the cleaning work on the floors in place at c. 1,30 in the two rooms.
The emptying of the pit silo Pt. 1485 continues, and between 4,00 and 4,50 many pesons (?) of dark grey-brown earth, unfired co , of varied shapes:
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain
