Trench W. Rampart - the former workmen are there put back to work while waiting for the setting up of the area W Paving quarter 6 W.
Bench 4-5E - Removal of the layer of bricks in which the foundations of the walls are embedded, beneath the layer of ash -
104 E. The passage in the wall of rubble has its base at 10 cm above the white floor on which the pithoi rest. It is filled with brick earth, containing sherds, with a layer more ashy at the base, corresponding to the ash layer of the level II - It slopes down, descen- ding from E to W (cf. sketch level). To the E, this passage leads to the