Page 65Scan 129 of 184
Sunday 10 October 1965 Rest day - Work at the camp -
Monday 11 October 1965_ 23rd day of the area.
Pegging out and opening of a new trench of pegs 619 to 626, to the East of the zone already excavated of the sanctuary of the God of the Ingot.
Drawing: plan of three rectangular trench sections A, B and C with point markers; labels: 511; C; 619; A; B; 626
A = trench 519 to 526 stopped at level I of the sanctuary - B = new trench C = old trench still in progress of excavation.
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain
