Unnumbered pageScan 86 of 96
1167 Film 78
29 24. Plt 64 - looking north from S. side th. end, showing late wall to be removed possibly tomorrow. L = 150 exp 1/20 ap 9 4.30 PM 10/11/41.
30 25. Same looking down from east end. 4.40 PM. Same exposure.
26
31 26. Plt 64 before removing sample of P 219 - 1 2 + 3 left from last year Looking east L = c 100 ap 8 exp 1/60
34 32 27. Same looking S. E 9.45 L = 100 ap 9 exp 1/20 11/11/41
Right page
1168 Diary fp 1159
Nov 10 Began a tunnel in Plt 1161- 4, over preliminary fill. Very hard. dark brown w Havara + gravel + river stones - not very regular stones. 10 night began clearing tunnel a little further 1161-S5. a couple of stray bumper jars + wall to be underling, to take rock away at rock (unlike 45-2) No gravel + river river stones - just fill however, - not overhung.
Nov 11 Began removing sample Plt 219 - 2 left from last S over dromos cut ramp.
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain
