Page 1655Scan 29 of 103
Drawing: vertical grid with two lines; labels: 12 e, 12 e, 10 e, 10 e, 8 e, 8 e, 6 e, 6 e, 5
N ↑ SCALE 1:50 TRENCH 11. PLAN TRENCH
Right page
DIARY
Propylon porch 1659- Finished digging down to approx. late floor level in propylon porch, removing turf which has grown here since the war. See. Film 131- 11 & 12, and sections pp. 1659. After removing turf in some areas we may be below floor level, and deeper than we dug here before the war.
1 April'50 W. Bldg. Arch bl. 209 495-504 Removed from W. Bldg. room 1, capital, arch blk no. 209. See Film 131 - 13 & 14 & notes thereon, and pp 495-504 Floor level may well have been slightly below level at which capital was found to be lying but only very little. The level was a deliberate fill thrown in over rock to serve as a floor & level out the un-even levels of the bedrock.
Propylon porch 1659-2 487-2 Continuing to remove in propylon porch clean fill of rich brown earth under late floor - p 1659-2 [see also p 487-2].
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain
