Page 860Scan 31 of 103
Right page
DIARY from p. 852
December 2 Filling in Trench 9 E-I north 24-28 (See Film 162 #17; and rock, hewn trench north end south section Street 1 Trench 9 about 0 north, about 19. See p. 737. Also filled in up to a few centimeters below pavement p. 691 and p 693 areas. Continuing to dig drain leading from Street 1 Trench 10, p 831-2. Finished digging p. 827 drain stratum 5. Removing stratum below stylobate north of north porch of S East Building. This area I am calling the East Building Court. Continued digging Trench 9 5-7, east 8-10, debris. Removed p. 829 (X)-3.
December 3 Filling in portion Street 1 room with large threshold. Continued digging Trench 9 5-7, south 8-10 debris - down to possible trodden level where debris ends. Continued excavating in East Building Court. Began digging p. 835-2.a in drain Reached rock in drain at I p. 827-6 also drain at I p 831-3. cont 866
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain
