3924. Trench 10, A-E east 16-18 25. after removing surface soil down to foundation for pavement. Looking north. L = 150 op 9 sp 1/40 25 Nov 2:00PM
3825. Same looking south. Note drain near E and crossing trench at I and running along east side of trench barely visable. -
3726. Eastern extension of drain leading from πλατεῖα between Altar 2 and S. Bldg. just after it issues from part covered by large stone slabs. L = 150 sp 1/40 op 9. 25 NOV. 3/4:10 PM.
3627. Trench 10, A-B, east 24-26 before removing surface soil. 22-24 to left already dug down to foundation of pavement and top of drain. Looking north. L = 150, sp 1/40 op 9. 25 Nov 3:20 PM
3528. Trench 10, A-I east 18-22 before removing surface soil. Looking north. L = 150, op 12: 9, sp 1/40 28 Nov. 47 10.00 AM.
cont. p. 830
Right page
DIARY from page 814
Trench 10, I-Z, east 10-12, aft removing 2d stratum. Trench 10 I-E east 4-6, removed 2d strat (all but sample of subfoundation for pavement between 4 & E) and strat. 3, E-Z in rock hewn ditch. Trench 10, A-AB west 10-12 first stratum (surface soil) and A-Y, surface soil, and A-Y, west 12-14, surface soil.
26 & 27 Nov. work called off on account of rain. Rained both days up to 10.00 AM, only but weather looked very threatening
28 Nov. Fine clear weather. Removing surface soil: Trench 10, A-B, east 22-26. Trench 10, A-Y, west 16-18 surface soil down to Mr. Hill continues digging north and east of East Building. Trench 10, A-E, strat 4 - (in rock-hewn trench) east - 10-12 Tracing drain system east into Trench 9 system. Dug Trench 9, S-E, south 8-10. Also cleared out part of drain leading from πλατεῖα between South Bldg and Street 1
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain