Diary March 28. July 10 men working: - Remove 2nd stratum O-2 west of South Building 1st surface soil west of trench [illegible] surface soil A-B South 4-26,
March 30_ Novelty going - removed 2nd stratum west 2-4 of South Building
March 31Removed 2nd stratum of Room 1, central dug trench
April 1_ Removed jagged stratum of Room 2 of South Building A found 1. 2nd pat [illegible] Began removing second stratum east of east wall of South Building
April 2Finished second stratum west of east wall, of South Building dug 1st [illegible] on A - [illegible] 14-18, continued removing surface soil in trench B-20, A-B and began F-E, South 8, [blank] corn 147 p. 128 in water trough
April 3Dug 2nd stratum South 6-8. Cleared surface trench! Cont p. 131.