Page 76Scan 44 of 105
Right page
Diary cont fr p. 67. Dec. 13: St [illegible] B-E 0-6. St C [illegible] Apollo B 1/M-N east 6-14, T A-M east 10-14, T S 1-17, west 8-10, M-N west 10-14, 1st stratum; [illegible] street, 7 to 9-8. also K-M east 0-4.
Dec 14Tr 5 /1-N west 18-26 continued. Level of 1st stratum. K-A east 4-14, M-N east 6-14 Tr 1 B-I south 0-4
Dec 16(Monday) Tr 5 / K east 20-26 [illegible] Tr 5 / M-N west 20-24, 26-28 N-O west 26-28 1st stratum. all 1st 2nd stratum of floor 3 are [illegible] cleaned room 7 as far south as Tr 5 1. very centre.
Dec 17Tr 5 W-O west 22-26 began cleaning corridor 3 & Room 5 east. 1st slump. Tr 5 N-O west 22-24.
Dec 18Completed removing 2nd strat. Room 7. Cleared out BF 1 to corridor 2. Tr 5 [illegible] west 20-22, N-O-11 west 22-24
Dec 19Tr 5 M-N west 4-8 finished down to second stratum. Tr 5 N-O west 18-22 w for soil.
Dec 20Work called off at 11:00 A.M. on account of rain cont p. 85
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain
