Page 5Scan 9 of 83
Right page
| 21-10-48 | 20:11 |
Remove stones of bin at 9.46 level. They lie on a double row of mud bricks, which cut the 9.46 level & continue through the footing trench to the west wall. The plaster floor of the bin goes up on to them: this is a special layer later than the plaster floor of the rest of the room.
Drawing: plan of wall, footing trench, bricks, and stones; labels: 20:8 ↑, 20:14 ↢, drain, footing tr., drain, 20:11, ⇥ 20:12, /// = brick., 0 20 40 50
To p. 7
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain
