Page 21Scan 22 of 57
Then closing of this UF 11 and opening of UF 12 for the fill beneath this floor. Closing of this UF 12.
•Opening of UF 13, in K 91/4 and K 9/1, cleaning of the trench dug in the extension of wall 724; trench 2.50 m wide (E-W) x 5.90 m long (N-S).
•In J 8/2 opening of UF 14, dismantling of the upper lateral level east → east of pillar 708, above the floor [same operation as UF 10, but limited to the layer above the floor of the 2nd state]. Closing of UF.
•Opening of UF 15 in L 8/2 and K 8/1, cleaning of wall 724.
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain
