Unnumbered pageScan 3 of 70
2 2
* Wednesday 15 September 1999
Nothing - Cleaning of the site
*Thursday 16 September 1999 Start of the excavation .
-> on ramp 731 • at the location of the service corridor, at the [illegible]south and at west of the ramp, resumption of the excavation at the level of the floor 478 (state 3) . => excavation of the upper part of a fill consisting of a sediment of green colour with large fragments of substrate = UF 3 this layer, characteristic of state 3 floods the brick structure crue loc 821 - 822 .
•on ramp 731 itself - excavation of the fill of state 3 [illegible] covering the ramp of state 2 = UF 1
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain
