Friday 28 September_ 8
Continued clearing of ramp 491, UF 20/3
- The ramp stops about 2 m from the W/E section: it is not clear whether the ramp is broken - (the end is partly torn away...) = destruction deliberate, of the ramp (1) at the time of the construction of the ramp (2) or whether it really stopped there => sounding to be made in depth to determine the thickness of the substructure
- The lateral rails are broken.
- To the N, a floor begins to be distinguished in green + red konnos that "slopes" towards the N. But problem: the supposed presence of this floor (to be cleared more precisely) in the W-E section is 30 cm above the bedrock in place
=> is it really a shoreline? the deposit of ± 0,30 m of konnos is it really a floor or the decomposition of the rock in place? in that case, the ramp would end in earth (pblme of tide? of construction ± in the water - But wall 460....), at a suitable height; yet, we saw yesterday that wall 460 seemed to have been dug into the konnos (= trench of foundation) - To see with Paul Sanlaville -
Very few sherds = two black Attic, early _IV_e and four atypical = fill of the 2nd state -
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain