Cleaning in H8/3, in the extension of the slabs of marmaro 447, to see whether there is a level of marmaro that was missed in 1985. (17) nothing visible.
Thursday 1 October.
Holiday (Independence Day) Sherds
Friday 2 October
H8/1 - continuation of UF 206 (= robber trench 476)
H9/3 - continuation of UF 208 + cleaning of the square.
- in H8/1, in robber trench 476, one sees the remains of the partition wall parallel to 453 = wall [476] Cleaning of the wall and end of excavation in this square
- in H9/3, final cleaning of the square, end of excavation.
Monday 5 October
- Opening of a trench in G10/4, east half. = 1/2 square, elongated North. South, 5 m x 2,5 m, in the east part of the square.
In this sounding, located 5 m east of H9/3 and of the partition wall 453, we hope to find a new partition wall further east (or a return wall ??).
= [UF 209]
- Bulldozer work: opening over 2,50 m towards the North of I8/2 - I8/1 - J8/2 = we set back the whole north limit of the excavation
65 figures hard to readstruck struck outadded written in above” jug ditto, and what it repeatsword reading not certain